Stock Report

SJVN Limited allotted new hydroelectric projects in Chenab basin



Posted On : 2020-12-24 13:19:01( TIMEZONE : IST )

SJVN Limited allotted new hydroelectric projects in Chenab basin

The Government of Himachal Pradesh in its cabinet meeting held on 23.12.2020 decided to allot 104 MW Tandi, 130 MW Rashil and 267 MW Sach Khas hydroelectric projects (total 501 MW) on Chenab Basin in Himachal Pradesh to SJVN Limited.

Shares of SJVN Ltd was last trading in BSE at Rs.25.1 as compared to the previous close of Rs. 25.15. The total number of shares traded during the day was 182516 in over 377 trades.

The stock hit an intraday high of Rs. 25.7 and intraday low of 24.9. The net turnover during the day was Rs. 4595736.

Source : Equity Bulls

Keywords