ACME Solar Holdings Limited ("ASHL"), through its wholly owned subsidiary i.e. ACME Suryodaya Private Limited, has commissioned 240.720 MWh capacity of Battery Energy Storage System (BESS) project located at Village: Sanwara and Mehar Nagar, Tehsil-Pokhran, Dist: Jaisalmer, Rajasthan, on June 30, 2026. The commercial operation date (COD) for the same shall be July 02, 2026.
With this, ACME Suryodaya Private Limited has achieved a commissioned capacity of 285 MW / 842.624 MWh.
Shares of ACME Solar Holdings Limited was last trading in BSE at Rs. 380.50 as compared to the previous close of Rs. 379.05. The total number of shares traded during the day was 306815 in over 2318 trades.
The stock hit an intraday high of Rs. 383.70 and intraday low of 374.10. The net turnover during the day was Rs. 116650833.00.