The company has announced that the second part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited, is declared on Commercial Operation w.e.f. 00:00 hrs of 20.02.2026.
The current commercial capacity of NTPC Green Energy Limited Group stands at 8827.68 MW. With the addition of this capacity, the total installed capacity of the NTPC Green Energy Limited Group has increase to 8992.68 MW.
Shares of NTPC Green Energy Limited was last trading in BSE at Rs. 90.48 as compared to the previous close of Rs. 89.68. The total number of shares traded during the day was 449954 in over 4295 trades.
The stock hit an intraday high of Rs. 90.90 and intraday low of 88.88. The net turnover during the day was Rs. 40371204.00.