NTPC Green Energy Limited has announced that seventh part capacity of 243.66 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat under CPSU Scheme Phase-II TrancheIII of NTPC Renewable Energy Limited a wholly owned subsidiary of NTPC Green Energy Limited, is declared on Commercial Operation w.e.f. 00:00 hrs of 17.12.2025.
The current commercial capacity of NTPC Green Energy Limited Group stands at 7645.675 MW. With the addition of this capacity, the total installed capacity of the NGEL Group will increase to 7,889.335 MW.
Shares of NTPC Green Energy Limited was last trading in BSE at Rs. 90.28 as compared to the previous close of Rs. 90.50. The total number of shares traded during the day was 218019 in over 3784 trades.
The stock hit an intraday high of Rs. 90.49 and intraday low of 89.85. The net turnover during the day was Rs. 19643264.00.