Stock Report

NTPC Renewable Energy Ltd commissions part capacity of 95.75 MW Solar PV Project



Posted On : 2025-10-17 21:59:49( TIMEZONE : IST )

NTPC Renewable Energy Ltd commissions part capacity of 95.75 MW Solar PV Project

Consequent upon successful commissioning, part capacity of 95.75 MW out of 1255 MW Khavda-I Solar PV Project under CPSU scheme Phase-II Tranche-III located in Gujarat of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited, is declared on Commercial Operation w.e.f. 18.10.2025.

The current commercial capacity of NTPC Green Energy Limited Group stands at 7419.975 MW. With the addition of this capacity, the total installed capacity of the NGEL Group will increase to 7515.725 MW.

Shares of NTPC Green Energy Limited was last trading in BSE at Rs. 100.00 as compared to the previous close of Rs. 99.89. The total number of shares traded during the day was 188266 in over 1890 trades.

The stock hit an intraday high of Rs. 100.10 and intraday low of 99.25. The net turnover during the day was Rs. 18789959.00.

Source : Equity Bulls

Keywords

INE0ONG01011 NTPCGreenEnergy PowerGeneration NTPCRenewableEnergy SolarPVProject