After successful completion of trial run on 05.06.2025, NHPC declares Commercial Opeartion Date (COD) of 3rd phase of part capacity of 53.57 MW w.e.f. 07.06.2025 of 300 MW Karnisar Solar Power Project, Bikaner. The cumulative commercial operation capacity of above project has reached to 160.71 MW out of total 300 MW.
Shares of NHPC Limited was last trading in BSE at Rs. 89.29 as compared to the previous close of Rs. 87.63. The total number of shares traded during the day was 2055871 in over 11651 trades.
The stock hit an intraday high of Rs. 89.60 and intraday low of 87.80. The net turnover during the day was Rs. 182897294.00.