Stock Report

NTPC Green Energy Ltd commissions last part capacity of 60 MW



Posted On : 2025-05-03 11:35:26( TIMEZONE : IST )

NTPC Green Energy Ltd commissions last part capacity of 60 MW

Based on certificate dated 30.04.2025 issued by Gujarat Energy Development Agency (GEDA), third and last part capacity of 60 MW out of 150 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited awarded under GUVNL/500 MW/Solar (Phase XII) tender, is declared on Commercial Operation w.e.f. 16.04.2025.

The first part capacity of 60 MW and second part capacity of 30 MW has already been declared on commercial operation w.e.f. 29.07.2024 and 11.12.2024 respectively.

Shares of NTPC Green Energy Limited was last trading in BSE at Rs. 101.25 as compared to the previous close of Rs. 100.45. The total number of shares traded during the day was 330253 in over 2721 trades.

The stock hit an intraday high of Rs. 102.30 and intraday low of 100.35. The net turnover during the day was Rs. 33476792.00.

Source : Equity Bulls

Keywords

INE0ONG01011 NTPCGreenEnergy PowerGeneration NTPCRenewableEnergy GEDA Certification PartCapacity 60MW