Adani Renewable Energy Forty Eight Limited, a step-down subsidiary of Adani Green Energy Limited ("AGEL") has commissioned a 57.2 MW wind power component of its wind-solar hybrid project at Khavda, Gujarat.
With commissioning of this plant, AGEL's total operational renewable generation capacity has increaseto 11,666.1 MW.
Based on the relevant clearances, it was decided at 2.51 p.m. on January 14, 2025 to operationalize the plant and commence power generation from January 15, 2025.
Shares of Adani Green Energy Limited was last trading in BSE at Rs. 1007.55 as compared to the previous close of Rs. 889.90. The total number of shares traded during the day was 1419776 in over 39387 trades.
The stock hit an intraday high of Rs. 1019.35 and intraday low of 890.05. The net turnover during the day was Rs. 1403178907.00.