Consequent upon successful commissioning, second part capacity of 10 MW of 20 MW Gandhar Solar PV Project at Gandhar, Gujarat, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 07.06.2023.
The first part capacity of 10 MW has already been declared on commercial operation w.e.f. 00:00 Hrs. of 23.08.2022.
With this, standalone installed and commercial capacity of NTPC will become 56378 MW, while group installed and commercial capacity of NTPC will become 72364 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 174.15 as compared to the previous close of Rs. 174.40. The total number of shares traded during the day was 259214 in over 2564 trades.
The stock hit an intraday high of Rs. 176.20 and intraday low of 173.65. The net turnover during the day was Rs. 45329445.00.