Arisinfra Solutions Limited ("the Company") has secured a Work Order of ₹79.05 crores for execution of Loading, Transportation and Disposal of Excavated Material from tunnel at the approved dumping yard land assigned by J. Kumar - NCC (GMLR) JV for the GMLR Project.
The J. Kumar - NCC JV (a 50:50 joint venture between J. Kumar Infraprojects and NCC Limited) is the lead contractor for the landmark Goregaon-Mulund Link Road (GMLR) twin tunnel project in Mumbai.
Shares of ArisInfra Solutions Limited was last trading in BSE at Rs. 106.55 as compared to the previous close of Rs. 107.05. The total number of shares traded during the day was 5778 in over 143 trades.
The stock hit an intraday high of Rs. 110.75 and intraday low of 106.30. The net turnover during the day was Rs. 620356.00.