ACME Solar Holdings Limited ("ASHL"), through its wholly owned subsidiary i.e. ACME Sun Power Private Limited, has commissioned 33.333 MW/160.480 MWh capacity of Battery Energy Storage System (BESS) Project located at Village: Badi Sid, Tehsil-Bap, Dist: Phalodi and Jodhpur, Rajasthan, on May 04, 2026. The Commercial operation date (COD) for the same shall be May 06, 2026.
With this, ACME Sun Power Private Limited has achieved a commissioned capacity of 200.003 MW / 962.940 MWh.
Shares of ACME Solar Holdings Limited was last trading in BSE at Rs. 298.55 as compared to the previous close of Rs. 303.00. The total number of shares traded during the day was 100553 in over 2289 trades.
The stock hit an intraday high of Rs. 306.95 and intraday low of 295.05. The net turnover during the day was Rs. 30234069.00.