Olectra Greentech Limited has declared 31st December, 2025 as the Commercial Operation Date (COD) for its Greenfield Electric Vehicle (EV) Manufacturing Facility situated at Seetharampur, Hyderabad, Telangana ("Facility") with an annual per shift production capacity of 2,500 buses. This declaration has been communicated to State Bank of India ("Lender"). This Phase-I capacity achievement of 2,500 buses Per Annum represent 50% of the planned per shift annual capacity of 5,000 buses Per Annum.
Shares of Olectra Greentech Limited was last trading in BSE at Rs. 1200.55 as compared to the previous close of Rs. 1198.95. The total number of shares traded during the day was 10113 in over 723 trades.
The stock hit an intraday high of Rs. 1224.70 and intraday low of 1197.85. The net turnover during the day was Rs. 12165234.00.