Consequent upon successful commissioning and due approvals, Unit II (250 MW) of Tehri PSP (4X250 MW) of THDC India Limited is declared on Commercial Operation w.e.f. 00:00 Hrs of 10.07.2025.
With this, total installed and commercial capacity of THDC India Limited has now become 2,747 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 343.20 as compared to the previous close of Rs. 337.65. The total number of shares traded during the day was 1213631 in over 17615 trades.
The stock hit an intraday high of Rs. 343.70 and intraday low of 337.05. The net turnover during the day was Rs. 414478910.00.