Based on achievement of approved norms and due approvals, 2nd Unit of 800 MW capacity of Darlipali Super Thermal Power Project (2 x 800 MW) has successfully completed trial operation and consequently included in the installed capacity of NTPC.
With this, the total installed capacity of NTPC and NTPC group has become 53450 MW and 66875 MW respectively.
Shares of NTPC LTD. was last trading in BSE at Rs. 118.5 as compared to the previous close of Rs. 119.3. The total number of shares traded during the day was 1416327 in over 5294 trades.
The stock hit an intraday high of Rs. 120.05 and intraday low of 118.25. The net turnover during the day was Rs. 168447303.