Stock Report

ACME Suryodaya Pvt Ltd commissions BESS project



Posted On : 2026-02-25 22:14:59( TIMEZONE : IST )

ACME Suryodaya Pvt Ltd commissions BESS project

ACME Solar Holdings Limited ("ASHL"), through its subsidiary i.e. ACME Suryodaya Private Limited, has commissioned the first phase of 19 MW/38 MWh out of 285 MW/600 MWh capacity of Battery Energy Storage System (BESS) Project located at Village: Sanwara and Mehar Nagar, Tehsil-Pokhran, Dist: Jaisalmer, Rajasthan.

This project will currently be deployed as a merchant capacity while ASHL retains flexibility to shift to a long term PPA in future.

The Commercial operation date (COD) for the above-mentioned Phase-I shall be February 27, 2026.

Shares of ACME Solar Holdings Limited was last trading in BSE at Rs. 233.85 as compared to the previous close of Rs. 231.65. The total number of shares traded during the day was 73927 in over 1592 trades.

The stock hit an intraday high of Rs. 234.45 and intraday low of 225.45. The net turnover during the day was Rs. 17162203.00.

Source : Equity Bulls

Keywords

ACMESolarHoldings INE622W01025 ACMESuryodaya FirstPhase BESSProject