GPT Infraprojects Limited (GPTINFRA) is pleased to announce that the Company has received the following contract totaling to Rs. 195 Crore.
The contract is for Detailed Engineering, Supply and Installation, Testing and Commissioning of Conveyor Belt System for Phase 2 development works - SOCIM and TIPSP Connection to Terminal Industriel Polyvalent de San Pedro (TIPSP)
The outstanding order book for the Company now stands at Rs. 4,047.65 Crore with total order inflow for Fiscal 2026 of Rs. 591 Crore.
Shares of GPT Infraprojects Limited was last trading in BSE at Rs. 104.05 as compared to the previous close of Rs. 104.65. The total number of shares traded during the day was 2258 in over 94 trades.
The stock hit an intraday high of Rs. 104.80 and intraday low of 103.10. The net turnover during the day was Rs. 234681.00.