Vascon Engineers Limited has received Work Order from M/s Transcon-Sheth Creators Private Limited for Construction of Composite Sale Building No. 3 Rehab, Malad, Mumbai amounting to Rs. 37.74 Crores. The work has been awarded on 'Lump sum Basis'. The work has to be completed within 27 months from the date of receipt of this Work Order.
Shares of Vascon Engineers Ltd was last trading in BSE at Rs.13.64 as compared to the previous close of Rs. 14.03. The total number of shares traded during the day was 43435 in over 163 trades.
The stock hit an intraday high of Rs. 14.15 and intraday low of 13.33. The net turnover during the day was Rs. 590876.