ITD Cementation India Limited have received Letters of Acceptance for the following projects:
- LOA from Bangalore Metro Rail Corporation - Design & Construction of Underground Structures (Tunnels & 4 Stations) of length 4.591 Km (approx.) from South of Tannery Road Station to North Ramp including Allied works in Reach-6 Line of Bangalore Metro Rail Project, Phase-2.
- 3 LOAs from IRCON International Limited - Tunnelling works on Sivok (West Bengal) to Rangpo (Sikkim) New Single Broad Gauge Railway Line Project comprising of Construction of 6 Tunnels.
- LOA from Municipal Corporation of Greater Mumbai - Construction of Sewer Tunnel and allied works along S.V. Road by Segmental Tunnelling Method.
Shares of ITD CEMENTATION INDIA LTD. was last trading in BSE at Rs.62.65 as compared to the previous close of Rs. 60.05. The total number of shares traded during the day was 82087 in over 834 trades.
The stock hit an intraday high of Rs. 63.05 and intraday low of 59.65. The net turnover during the day was Rs. 5086181. |